Our Most Recent Case Study
HVAC Repair at the Highland Park Golf Clubhouse in Auburn, NY
Two roof-top-units and two furnaces were installed at the Highland Park Gold Clubhouse in Auburn, New York, to heat and air condition the building. An exhaust system was installed to exhaust air from the bath and locker rooms. Gas piping was installed for the RTUs, furnaces, water heater and kitchen equipment. The kitchen hood was connected to the exhaust fans and make-up air unit.
Plumbing and Heating Systems Installed at Wilkins RV in Bath, NY
Wilkins RV decided to build a new facility in Bath, NY with a showroom, service bays and offices. They eventually selected Chrisanntha Construction for the general contractor. Chrisanntha Construction picked us as the design build contractor for the plumbing and heating systems.
4.05 kW Solar Electric System Installed in Lansing, NY
A homeowner in Lansing, New York wanted some solar panels installed to produce energy.
6.9 kW Solar Electric System Installed in Hector, NY
This customer in Hector, NY was interested in having a solar electric system installed, but not on thir home. This would need to be a ground-mounted system.
Lima, NY Home Improves Efficiency with 3 Ton Water-Based Geothermal System
This new Net Zero and LEED certified home was in need of a geothermal system.












