Commercial Services Case Studies: Hydronic HVAC Repair at Cazenovia College in Cazenovia, NY

View Photo Gallery

Challenge

Four story addition to the shove hall dormitory at Cazenovia College in Cazenovia, New York. A hydronic heating and air conditioning system and make-up air unit were used on this project. A complete installation of a plumbing system and electrical system were also included.

Solution

The hydronic system consists of 2-boilers, a cooling tower and heat pumps for the apartments. The make-up air unit supplies fresh air to the corridors on each floor.

The plumbing system consists of a water service, 1-boiler, 2-indirect hot water storage tanks, all plumbing fixtures, hot and cold water lines and re-circulation hot water lines.

The electrical system consists of an electrical service, distribution panels, lights, equipment power connections and receptacles.

Project Summary

General Contractor: Wilmorite Inc.

Engineer: Robson Woese Engineering

Architect: GPK Architects

our service area

We serve the following areas

Our Locations:

Halco
865 County Road 6
Phelps, NY 14532
1-315-688-1945


Halco
1730 Mecklenburg Rd Suite B
Ithaca, NY 14850
1-607-218-8448


Halco
204 Bass St
Liverpool, NY 13088
1-315-992-6300


Halco
140A Metro Park
Rochester, NY 14623
1-585-200-3364
Service Map
Top